HSE Activities

HSE Activities

General Deliverables

HSE Philosophy

Fire Protection Philosophy

Fire & Gas Cause and Effect Matrix

Fire Water Demand Report

Firewater Line list

Firefighting And Safety Equipment List

Hazardous Area Source List

Hazardous Area Layouts

Inputs To Other Departments

Markup For F&G Devices (Building & Process Unit)

Equipment Categorization

Restriction Orifice Process Data Sheet

Safety Studies

Project HSE Review (PHSER) Study Methodology & Report

Fire & Gas Mapping Study Methodology & Assumption Register & Report

Evacuation, Escape and Rescue Assessment (EERA) Study Procedure & Report

Escape, Evacuation & Rescue Assessment (EERA) Study Worksop

HAZID Terms of References (Tor) & Recommendation Closeout Report

HAZOP Methodology/Workshop/Report/ Recommendation Closeout Report

Vent Dispersion Analysis

Hazan Study Procedure & Report

SIMOPS Procedure & Report

Active Fire Protection

Conceptual Layout for Fire Water System

Passive Fire Proofing Layout

P&ID for Fire Water Network & Hydraulic Calculation

P&ID for fire water Pumps

P&ID for fire Water Booster Pumps

P&ID for Landing Valve

P&ID for Water Spray System – Column

P&ID for Water Spray System – Vertical Vessel

P&ID for Water Spray System – Horizontal Vessel

P&ID for Water Spray System – Compressor

P&ID for Water Spray System – Pumps

P&ID for Water Spray System – Cable Seller

P&ID for Water Spray System – Transformers

Datasheet For – Hydrant

Datasheet For – Hose Box

Datasheet For – Hose Reel Type-A

Datasheet For – Hose Reel Type-B

Datasheet For – Monitor

Datasheet For – Remote Operated Monitor

Datasheet For – Deluge Valve

Datasheet For – Safety Shower & Eyewash

Process Datasheet for Firewater Pumps

Process Datasheet for Firewater Booster Pumps

Process Datasheet for Foam Skid

Process Datasheet for Foam Concentrate Pumps

Passive Fire Protection

Passive Fire Proofing Schedule

Passive Fire Proofing Layout 

Extinguisher Layout – Process Area/Control Building/Substation

MRs

Purchase Requisition for Safety Shower & Eyewash

Purchase Requisition for Fire Extinguishers

Purchase Requisition for Water Cum Foam Monitor

Purchase Requisition for Deluge Valve with Accessories and Spray Nozzles

Purchase Requisition for Fire Fighting & Safety Equipment

Purchase Requisition for Clean Agent System

Other Activities

Piping Layout Review & Comments

3d Model Review (30%, 60%, 90%)

Check & Review of Sub-Ordinate Work

Equipment Categorization

Interface & Internal Inputs